Fern Bank, Cincinnati
Projected route based on reports
A 7.9 mile circuit used for a round of the AAA National Championship Trail
in 1911. The map shows the projected route highlighted in black - it ran from
Silverton, to Blue Ash and Montgomery. A 7.9 mile circuit, possibly very
similar or the same as this one, was used in 1954.